北京鸿利制冷设备公司专业从事冷库安装
      现在时刻:2020/10/29  星期四
 
产品导航
冷库
┼攠數畣整爠煥敵瑳∨≡┩愾..
冷库门
制冷设备
技术支持
法丝勒加热线
智能温度记录仪
HL型温湿度记录仪软件演示..
小精灵电子温控器
丹麦织物空气悬挂类型
联系我们

地址:北京市海淀区苏家坨镇草厂村九王坟8号平房
联系人:吴中阳
电话:400-9988-381
手机:13910108274
邮箱:honglixingye@163.com
网址:www.bjhlzl.com
产品展示
悬挂类型十一
 

Suspension Type 11


 

Step by Step
Installation of Type 11


Before Starting the Installation

* Unpack all the components and place
them on a clean surface (mat/sheet).
Check to make sure that you have recieved
all the components specified on the enclosed
parts list. If components are missing,
contact FabricAir, Inc. immediately.

* In order to keep the FabricAir ducts clean,
handle the ducts with clean hands. Make
sure that any tools which might come in
contact with the ducts have been cleaned
before use.

* Make sure that the necessary tools are
available - see the instructions.

* Provide hardware for anchoring - see items
1 & 3 under installation sequence.

* If the ducts are to be installed in a new
building, purge the handling systems and
install the prefilter before installing the
FabricAir ducts. This is done to remove
dust, which would otherwise collect in
the FabricAir duct.

Installation Sequence

1. IPS T-rail (19) is installed, with the
rail forming a frame - meaning the rail
mounting lines spread identical to the
diameter of the duct with rail on the ends.
The rail is cut as mitre joints. The rail
is anchored directly to the overhead. Screws
are not included in the delivery, as the
type of screw depends on the building
structure. The rail has flanges for
anchoring with screws.

2. Once the rail has been installed, install
the FabricAir ducts can be installed. If the
duct is shorter than 30', it will normally be
delivered in one section. If the duct exceeds
30' it will normally be divided in sections
with zippers.
Press the bulb edge of the duct into the
T-rail. If the duct is divided in sections
- begin with the first section.

3. Once all sections have been installed in the
rail, zip the sections together. Fasten the duct
with the hem connection onto the AHU collar
with the mounting belt (17/18), and install
the locking track (20).

Follow the above procedure for installing
FabricAir Plenum ducts. Zip the FabricAir ducts
to the FabricAir Plenum duct.

After Completing the Installation:

Always be sure to give the customer a
copy of the maintenance instructions
and information concerning mainte-
nance intervals.

>>点此返回